Wheel, Wheel Bearing, Gland, Rim, Excavators, Roll

Sand Drift Removal 
Bambill North Road between Millewa Road and Sturt Highway, Werrimull 
Start: 7am, Monday 28 September 2020 
Finish: 5pm, Friday 27 November 2020 
Yarrara North Road between Sturt Highway and Millewa Road, Werrimull
Start: 7am, Monday 12 October 2020
 Finish: 5pm, Friday 27 November 2020 
 
Road Shoulder Works 
Freeman Road between Stewart Road and Nursery Ridge Road, Red Cliffs 
Start: 7am, Monday 16 November 2020 
Finish: 5pm, Friday 20 November 2020 
 
Road Reconstruction 
Wargan Road between Meridian Road and Curtis Road, Wargan 
Start: 7am, Monday 26 October 2020 
Finish: 5pm, Friday 4 December 2020 
Channel Road between Calder Highway and Palm Court, Merbein 
Start: 7am, Monday 7 September 2020 
Finish: 5pm, Friday 27 November 2020 
San Mateo Avenue between Big W entrance and De Garis Drive, Mildura 
Start: 7am, Monday 12 October 2020 
Finish: 5pm, Sunday 31 January 2021 
 
Road Resealing 
Boonoonar Road between Calder Highway and Kulkyne Way, Carwarp / Colignan 
Start: 7am, Monday 9 November 2020 
Finish: 5pm, Thursday 19 November 2020 
Murrayville Nhill Road between Mallee Highway and South Five Chain Road, Murrayville 
Start: 7am, Monday 23 November 2020 
Finish: 5pm, Friday 27 November 2020 
Meridian Access Road between Mallee Highway and Nestor Road, Walpeup 
Start: 7am, Monday 23 November 2020 
Finish: 5pm, Friday 27 November 2020 
Boinka South Road between Mallee Highway and Stock Route Road, Boinka 
Start: 7am, Monday 23 November 2020 
Finish: 5pm, Friday 27 November 2020 
 
Swale Repair 
Wentworth Road between Whiting Street and Red Gum Track, Merbein 
Start: 7am, Monday 19 October 2020 
Finish: 5pm, Friday 18 December 2020 
Red Gum Track between Wentworth Road and Chaffey Landing Track, Merbein 
Start: 7am, Monday 19 October 2020 
Finish: 5pm, Friday 18 December 2020 
 
Retaining Wall Deconstruction 
Nature strip adjacent to 450- 452 Eleventh Street, Mildura 
Start: 7am, Monday 16 November 2020 
Finish: 5pm, Friday 27 November 2020
 
Road Maintenance Works
Seventh Street from Magnolia Avenue to Seventh Street, Mildura
Start: 09/11/2020
End: 13/12/2020
Fifteenth Street from Sandilong Avenue, Irymple to Benetook Avenue, Mildura
Start: 02/11/2020
End: 20/11/2020
Wentworth Road from Comb Street to Red Gum Track, Merbein
Start: 19/10/2020
End: 18/12/2020
 
Road Construction Works
Fifteenth Street from Morpung Avenue to John Court, Irymple
Start: 10/10/2020
End: 30/12/2020
Fifteenth Street from Morpung Avenue to Koorlong Avenue, Irymple
Start: 04/09/2020
End: 30/06/2021
Seventeenth Street from Walnut Avenue to Ontario Avenue, Mildura
Start: 04/11/2020
End: 11/12/2020
Hattah-Robinvale Road near River Road, Hattah
Start: 13/11/2020
End: 23/12/2020
 
Utility Works
Millewa Road near Benetook Avenue, Koorlong
Start: 12/11/2020
End: 20/11/2020
 
Scheduled Roadwork
Sturt Highway at Carramar Dr, Buronga
Start: Mon 1 Jun 2020
Finish: Fri 20 Nov 2020
 
Traffic Alert - Emergency Works
Calder Highway near Irymple Avenue, Irymple
Traffic reduced to one lane in each direction at Irymple Avenue, due to roundabout construction works. 
Wide vehicles should detour using Belair Avenue, Sixteenth Street and Koorlong Avenue. 
Access to Irymple Avenue south of the Calder Highway is via Sixteenth Street only. 
Works are expected to be completed in January 2021.
 
 
Roads closed to the west of Mildura due to sand drift:
Baker Road near Bambill North Road, Werrimull
Yarrara North Road from Sturt Highway to Weatherhead Road, Meringur
Karween North Road from Sturt Highway to Karween South Road, Meringur
 
COVID-19 Border Control:
 
George Chaffey Bridge, Buronga
Abbotsford Bridge, Curlwaa
Murray Valley Highway, Euston
 
The NSW State Government has imposed restrictions on movements to/from Victoria as a result of the coronavirus pandemic.
Motorists approaching these checkpoints must present a valid Border Crossing Permit to enter NSW.
To apply for a permit visit www.service.nsw.gov.au/transaction/apply-covid-19-nsw-border-entry-permit
 
The South Australian State Government has imposed restrictions on cross-border movements as a result of the coronavirus pandemic.
People who live or work near or across the border and wish to seek an exemption should email This email address is being protected from spambots. You need JavaScript enabled to view it. and include as much information as possible in the email.
 
 

Image: PIRO4D on Pixabay